WEBVTT 1 00:00:20.900 --> 00:00:29.380 下面我就给大家讲一下城市总体规划中城市市政基础设施规划的要点 Next, I will tell you the main points of urban municipal infrastructure planning in the urban master plan 2 00:00:29.380 --> 00:00:31.600 在总体规划编制进程中 In the process of urban master plan 3 00:00:31.600 --> 00:00:34.450 同学们进入到专项规划阶段以后 After entering the stage of special planning 4 00:00:34.770 --> 00:00:36.840 往往会碰到很多新的问题 There are many new problems 5 00:00:37.110 --> 00:00:43.060 比如有些同学会进行总规中的城市市政基础设施规划 For example, some students will carry out urban infrastructure planning in the general planning 6 00:00:43.300 --> 00:00:49.390 主要包括城市的给排水 能源 通信 环卫等方面的规划 Mainly including urban water supply and drainage energy, communication, sanitation and other aspects of planning 7 00:00:49.620 --> 00:00:51.430 涉及的内容多 There are many contents involved 8 00:00:51.720 --> 00:00:53.890 对城市的发展的影响大 Also great impact on urban development 9 00:00:54.190 --> 00:00:58.780 这是城市总体规划中必须认真研究的一些内容 This is something that must be studied in urban master plan seriously 10 00:00:59.610 --> 00:01:05.070 大家在做城市总规中的市政基础设施规划之前 We need to do some preparatory work before making the municipal infrastructure planning 11 00:01:05.070 --> 00:01:06.650 要做一些准备工作 in the general urban planning 12 00:01:06.910 --> 00:01:09.100 这些准备工作做的充分 Only when the preparatory work is done sufficiently 13 00:01:09.100 --> 00:01:14.560 做出来的规划才可能符合上面的一些理念原则 can the planning conform to some of the above principles 14 00:01:14.710 --> 00:01:19.620 首先就是了解城市的发展和规划的情况 The first is to understand the development and planning of the city 15 00:01:19.980 --> 00:01:23.550 包括它的经济社会发展计划 Including its economic and social development plan 16 00:01:23.550 --> 00:01:27.940 以及我们这次规划方案的一些关键性问题和判断 And some key issues and judgments of our plan 17 00:01:28.210 --> 00:01:30.150 比如城市发展方向 For example, urban development direction 18 00:01:30.330 --> 00:01:32.510 城市空间结构等等 Urban spatial structure and so on 19 00:01:32.890 --> 00:01:34.480 知道了整体的情况 Only knowing the overall situation 20 00:01:34.480 --> 00:01:39.130 才能对局部的专项的发展做出正确的判断 can we make a correct judgment on the development of local special projects 21 00:01:40.030 --> 00:01:46.280 其次是全面了解城市市政基础设施各系统发展的历史和现状 Secondly, we need to fully understand the history and current situation of the development of urban municipal infrastructure systems 22 00:01:46.590 --> 00:01:48.640 要去读现状基础资料 To read the basic information of the current situation 23 00:01:48.780 --> 00:01:50.140 看现状图 Look at the current situation map 24 00:01:50.140 --> 00:01:54.850 也要看上版规划的现状和规划资料 We also need to look at the current situation and planning materials of the previous version of the plan 25 00:01:54.850 --> 00:01:56.830 现状了解了才能做好规划 Only when we understand the current situation can we make a good plan 26 00:01:57.580 --> 00:02:00.540 第三就是做一些相关法规规范 The third is to do some knowledge preparation of relevant laws 27 00:02:00.540 --> 00:02:05.020 市政基础设施系统规划的知识准备 and regulations municipal infrastructure system planning 28 00:02:05.510 --> 00:02:07.680 这些在我们的教材里都有 These are in our textbooks 29 00:02:07.970 --> 00:02:10.480 我们以前的教学中也讲过 Also in our previous teaching 30 00:02:10.660 --> 00:02:12.470 但经过一段时间以后 But after a while 31 00:02:12.480 --> 00:02:14.170 同学们可能会生疏了 Students may be unfamiliar with it 32 00:02:14.170 --> 00:02:16.850 所以需要进一步有一些复习 So we need to review it further 33 00:02:17.800 --> 00:02:25.830 下面讲一下我们城市总体规划中市政基础设施规划的理念和原则 Let's talk about the concept and principle of municipal infrastructure planning in our urban master plan 34 00:02:26.810 --> 00:02:30.080 根据近年来市政基础设施领域的发展趋势 According to the development trend of municipal infrastructure in recent years 35 00:02:30.280 --> 00:02:34.550 以及城市总体规划领域出现的一些发展和变化的趋势 And some development and change trends in the field of urban master planning 36 00:02:34.830 --> 00:02:38.690 我觉得在总体规划中做市政基础设施规划 I think it is necessary to make municipal infrastructure planning in the master plan 37 00:02:38.850 --> 00:02:42.650 主要应该体现在规划理念 有以下几点 It should be reflected in the following aspects 38 00:02:43.230 --> 00:02:45.740 第一个是动态发展的理念 The first is the concept of dynamic development 39 00:02:46.090 --> 00:02:50.130 要满足区域和城市发展各个阶段的要求 To meet the requirements of all stages of regional and urban development 40 00:02:50.930 --> 00:02:51.760 这是一个 This is the first point 41 00:02:52.130 --> 00:02:54.710 第二个是节约适用的理念 The second is the concept of economy and application 42 00:02:55.310 --> 00:02:59.590 跟节水 节能 减排的要求相吻合 In line with the requirements of water saving, energy saving and emission reduction 43 00:02:59.810 --> 00:03:03.000 并且符合当地的经济社会条件 And meet the local economic and social conditions 44 00:03:03.710 --> 00:03:06.560 第三是生态环保的理念 The third is the concept of ecological and environmental protection 45 00:03:06.560 --> 00:03:09.900 在规划中突出生态和环保的要求 Highlight the requirements of ecology and environmental protection in planning 46 00:03:10.360 --> 00:03:13.100 第四就是安全可靠的理念 The fourth is the concept of safety and reliability 47 00:03:13.300 --> 00:03:15.920 可以应对各种主要的灾害 Make it possible to cope with major disasters 48 00:03:16.110 --> 00:03:20.360 城市市政基础设施是最需要安全的 Municipal infrastructure is the most needed security 49 00:03:20.720 --> 00:03:23.220 所以这是我们的规划理念 So this is our planning concept 50 00:03:23.880 --> 00:03:25.920 那么谈到规划原则 So when it comes to planning principles 51 00:03:25.920 --> 00:03:28.380 我们总的原则是有这么三点 Generally we have three points 52 00:03:28.380 --> 00:03:30.590 一个是因地制宜 One is to adapt to local conditions 53 00:03:30.880 --> 00:03:32.530 一个是综合协调 One is comprehensive coordination 54 00:03:32.530 --> 00:03:34.250 还有一个是全面合理 Another is comprehensive and reasonable 55 00:03:36.040 --> 00:03:36.880 因地制宜 Adjusting measures to local conditions 56 00:03:36.880 --> 00:03:40.670 就是规划要与当地的实际情况紧密结合起来 means that the planning should be closely combined with the local actual situation 57 00:03:40.670 --> 00:03:41.860 要做出特点 The scheme should be featured 58 00:03:41.860 --> 00:03:44.890 能够解决当地的一些实际的问题 Be able to solve some local practical problems 59 00:03:45.360 --> 00:03:50.220 综合协调 就是处理好局部与整体 局部和局部 Comprehensive coordination is to deal with the relationship between the local and the whole, between the local and the local, 60 00:03:50.600 --> 00:03:52.360 各个系统之间的关系 and between the various systems 61 00:03:52.900 --> 00:03:57.170 使市政基础设施成为整个规划的一个有机组成部分 Make municipal infrastructure an integral part of the whole plan 62 00:03:58.420 --> 00:04:03.390 全面合理就是规划要符合各个单项基础设施发展的规律 Comprehensive and reasonable is planning should be in line with the law of each single infrastructure development 63 00:04:03.570 --> 00:04:09.560 要符合我们相关城市规划编制办法的一些要求 To meet some requirements of our relevant urban planning methods 64 00:04:10.130 --> 00:04:13.430 符合相关的法律法规和规范标准 Comply with relevant laws, regulations and standards 65 00:04:14.490 --> 00:04:19.250 下面我还会再具体讲怎么做才能符合这些原则 Now I will talk about how to comply with these principles 66 00:04:20.430 --> 00:04:23.480 接下来就是规划的任务和内容 Next is the task and content of planning 67 00:04:24.880 --> 00:04:26.450 这部分规划的任务 Tasks planned in this part 68 00:04:26.450 --> 00:04:29.720 我们可以把它分为基本任务和拓展任务 We can divide it into basic tasks and expansion tasks 69 00:04:30.360 --> 00:04:31.500 所谓的基本任务 Basic tasks 70 00:04:31.500 --> 00:04:33.950 我们把它精炼为十二个字 We refine it into three phrases 71 00:04:34.660 --> 00:04:38.900 选质定量 选点定源 选制定网 Type selection and quantity determination, point selection and source determination, form selection and network determination 72 00:04:39.360 --> 00:04:42.870 选质定量 就是解决供给和需求的问题 Type selection and quantity determination is to solve the problem of supply and demand 73 00:04:43.320 --> 00:04:47.210 选用什么类型的水 电 气 热 What type of water, electricity and heat should be selected 74 00:04:47.620 --> 00:04:49.830 他们所需要的量有多少 How much do they need 75 00:04:49.830 --> 00:04:51.680 这是选质和定量 It's type selection and quantity determination 76 00:04:52.460 --> 00:04:56.570 选点定源 就是解决关键设施的布局问题 Point selection and source determination is to solve the layout problem of key facilities 77 00:04:56.920 --> 00:04:58.670 要考虑各种设施 Various facilities should be considered 78 00:04:58.670 --> 00:05:00.330 比如说水厂 For example, water plant 79 00:05:00.630 --> 00:05:01.460 污水厂 Sewage treatment plant 80 00:05:01.680 --> 00:05:04.330 变电站 热电厂 煤气厂 Substation, thermal power plant and gas plant 81 00:05:04.570 --> 00:05:07.820 这样一些重要的基础设施 Such important infrastructure 82 00:05:07.990 --> 00:05:11.000 它们的服务范围和影响范围 Make reasonable site selection and layout 83 00:05:11.250 --> 00:05:13.930 进行合理的选址和布局 of their service scope and influence scope 84 00:05:14.710 --> 00:05:19.700 选制定网就是考虑供应排放和服务的网络 Form selection and network determination is to consider what kind of network is used 85 00:05:20.000 --> 00:05:21.560 到底采用什么形式 to supply emissions and services 86 00:05:21.880 --> 00:05:25.690 主要就是管线的走向到底是怎么样的 It's mainly about the direction of the pipeline 87 00:05:25.690 --> 00:05:29.770 怎么样做才能达到经济可靠的这样一个效果 How to achieve such an economic and reliable effect 88 00:05:30.550 --> 00:05:31.710 解决了上述问题 If the above problems are solved 89 00:05:31.710 --> 00:05:37.250 就基本解决了城市基础设施 硬件系统的一些大问题 some big problems of urban infrastructure hardware system will be basically solved 90 00:05:37.250 --> 00:05:39.710 完成了大部分的任务 Most tasks will be completed 91 00:05:40.230 --> 00:05:43.230 那么作为城市总体规划的一个部分 As a part of the urban master plan 92 00:05:43.470 --> 00:05:47.530 市政基础设施规划不仅仅要满足于做基本任务 Municipal infrastructure planning should not only be satisfied with basic tasks 93 00:05:47.770 --> 00:05:51.060 还应该完成什么样的一些拓展任务呢 What other expansion tasks should be completed 94 00:05:51.310 --> 00:05:54.150 所谓拓展任务包括以下几个方面的内容 The expansion tasks include the following aspects 95 00:05:54.150 --> 00:05:58.690 一是进行资源环境容量的分析和论证 First, analyze and demonstrate the capacity of resources and environment 96 00:05:59.320 --> 00:06:02.980 这个任务就是一般是前置的 This task is generally preposed 97 00:06:03.670 --> 00:06:06.620 在规划刚刚开始的时候就要去做 We need to do this task at the beginning of the plan 98 00:06:06.900 --> 00:06:13.070 主要是论证水资源水环境能不能满足规划的城市发展规模的需要 It mainly demonstrates whether water resources and water environment can meet the needs of planned urban development scale 99 00:06:13.370 --> 00:06:18.300 有时候还要考虑能源供给和垃圾处理的问题 Sometimes we have to think about energy supply and waste disposal 100 00:06:18.790 --> 00:06:21.490 这些问题对于城市规模的确定 These problems have a great influence on the determination of urban scale 101 00:06:21.490 --> 00:06:24.700 城市产业结构的调整都有很大的影响 and the adjustment of urban industrial structure 102 00:06:25.260 --> 00:06:30.230 这个任务一般会体现为一个或者几个专题研究 This task is usually embodied in one or several special studies 103 00:06:31.040 --> 00:06:35.540 二是进行城市市政基础设施的安全问题论证 Second, demonstrate the safety of urban municipal infrastructure 104 00:06:36.580 --> 00:06:39.730 现在的城市是一个高度复杂的巨系统 Today's city is a highly complex giant system 105 00:06:40.060 --> 00:06:42.810 但是也是相当脆弱的一个巨系统 But it's also a very fragile giant system 106 00:06:43.180 --> 00:06:47.160 很多城市的市政基础设施都是城市的生命线 The municipal infrastructure of many cities is the lifeline of the city 107 00:06:47.350 --> 00:06:52.220 比如说供水 供电 通信这几个方面 For example, water supply, power supply and communication 108 00:06:52.510 --> 00:06:53.900 一旦出现问题 Once there is a problem 109 00:06:54.270 --> 00:06:56.650 城市的安全就失去了保障 the safety of the city will be lost 110 00:06:57.090 --> 00:07:01.110 有些设施对周边地区又有比较大的安全影响 Some facilities have greater security impact on the surrounding areas 111 00:07:01.370 --> 00:07:04.150 比如煤气厂 液化气 储备站 For example, gas plant, liquefied gas and reserve station 112 00:07:04.380 --> 00:07:05.990 各种燃气管线 And various gas pipelines 113 00:07:06.620 --> 00:07:10.830 因此基础设施一方面要保证自身的安全 So on the one hand, infrastructure should ensure its own safety 114 00:07:10.830 --> 00:07:14.440 另外一方面要保障对整个城市安全供给 On the other hand, it is necessary to guarantee the safety supply to the whole city 115 00:07:14.620 --> 00:07:15.880 需要安全布局 Need security layout 116 00:07:15.880 --> 00:07:17.360 需要备用应急 Need standby emergency 117 00:07:17.520 --> 00:07:22.000 需要划设专门的防护空间进行安全保障 Special protective space needs to be set up for security 118 00:07:23.430 --> 00:07:24.690 对于这个问题 For this problem 119 00:07:24.860 --> 00:07:28.610 有时候可以放在防灾规划里面来考虑 Sometimes it can be considered in disaster prevention planning 120 00:07:28.810 --> 00:07:32.790 有时候需要进行专门的专题研究和论证 Sometimes special research and demonstration are needed 121 00:07:35.440 --> 00:07:39.410 三是体现新技术 新工艺在规划中的运用 Third, reflect the application of new technology and process in planning 122 00:07:40.250 --> 00:07:44.250 基础设施领域里有一些系统发展的很快 There are some systems in the field of infrastructure that are developing rapidly 123 00:07:45.520 --> 00:07:47.270 知识也在不断的更新 Knowledge is constantly updating 124 00:07:47.490 --> 00:07:48.740 比如通信系统 For example, the communication system 125 00:07:48.960 --> 00:07:50.860 两三年就可能换一代 may be replaced in two or three years 126 00:07:51.210 --> 00:07:53.350 规划方面的要求也不一样 And planning requirements are different 127 00:07:53.350 --> 00:07:56.550 比如新能源和可再生能源设施 Such as new energy and renewable energy facilities 128 00:07:56.550 --> 00:08:02.490 在规划里可能要去考虑太阳能电站 风电厂的这样一些设施的布局 In the planning, it may be necessary to consider the layout of such facilities as solar power plant and wind power plant 129 00:08:02.760 --> 00:08:05.760 比如中小型的分布式能源设施 For example, small and medium-sized distributed energy facilities 130 00:08:05.880 --> 00:08:13.110 可能会影响原有的一些大型能源设施的供给系统的组构方式 It may affect the composition of the supply system of some large-scale energy facilities 131 00:08:13.540 --> 00:08:17.990 又比如在环卫处理技术工艺方面的一些革新 For example, some innovations in environmental sanitation treatment technology 132 00:08:18.140 --> 00:08:22.510 可能导致单纯的垃圾收集处理发生改变 It may lead to the change of simple garbage collection and treatment 133 00:08:22.710 --> 00:08:24.880 进入到循环经济组织中去 Into the circular economy organization 134 00:08:25.070 --> 00:08:27.980 成为城市的一项重要产业 Become an important industry of the city 135 00:08:28.260 --> 00:08:34.530 在比如排水中 对雨水循环利用和下渗的问题有一些考虑 For example, in drainage, there are some considerations on rainwater recycling and infiltration 136 00:08:34.530 --> 00:08:39.650 会导致整个城市的排水方式排水量产生很大的变化 It will lead to great changes in the way of drainage of the whole city 137 00:08:39.840 --> 00:08:43.520 最近就有一个我们所谓的海绵城市 Recently, the drainage guidelines of 138 00:08:43.660 --> 00:08:45.360 排水导则出台 a sponge city have been issued 139 00:08:45.530 --> 00:08:51.260 所以我们对这些情况要有一定的敏感性 So we need to be sensitive to these situations 140 00:08:51.500 --> 00:08:56.130 光为以现状作为基础做规划是不够的 It's not enough to plan on the basis of the status quo 141 00:08:56.310 --> 00:09:00.380 还要对这些新技术新工艺有一定的敏感性 But also sensitive to these new technologies and processes 142 00:09:00.550 --> 00:09:06.760 对于这些技术工艺在城市未来的使用的前景有一定的预见性 It has certain foresight for the future use of these technologies in the city 143 00:09:06.960 --> 00:09:10.490 这样做出的规划才能够说得上前瞻性 Only in this way can the planning be forward-looking